SCOPE OF WORKS
The M6 J19 improvement scheme:
•Building a two-way link across the junction to allow better connection between the M6 and A556, including a new bridge spanning the M6 motorway within the roundabout
•Renewing traffic signals on the roundabout and its approach roads and adding new traffic signals for the Tabley Hill Lane / Pickmere Lane junction
•Adding new signs
•Improving local access for walkers and cyclists using the junction
Huyton Asphalt were contracted to carry out the base/binder and surface course on the new throughabout.
KEY CHALLENGES
Due to the complex design of this project which was amended throughout the duration of the contract, we were involved and collaborated at the design phase assisting with the material selection.
3,700 Hours 0 Accidents or incidents | |
CORPORATE SOCIAL RESPONSIBILITY
Free repair to the access ramp of the local church was undertaken.
COLLABORATION
Collaboration with a wide range of contractors was maintained to ensure programme critical works were completed, when required.