Morris Homes’ housing development in Clitheroe is in a charming town in the picturesque borough of the Ribble Valley. It’s a vibrant and historical community with its very own castle, and is located near to the Forest of Bowland.
HA Groundworks were proud to be appointed as a contractor to undertake the relevant preparation works for the final surfacing and adoption by the Local Authority.
Our works were completed in a efficient and timely manner with regular interaction with the local residents to ensure minimal disruption throughout the ‘live’ development.

Duration of Works8 weeks
New Kerbs460m
Iron Works44 Nr
Surfacing1,922m2

“The team have been polite, cheerful and above all, very hardworking. The team are industrious and a credit to themselves and their employers”