Morris Homes’ housing development in Clitheroe is in a charming town in the picturesque borough of the Ribble Valley. It’s a vibrant and historical community with its very own castle, and is located near to the Forest of Bowland.
HA Groundworks were proud to be appointed as a contractor to undertake the relevant preparation works for the final surfacing and adoption by the Local Authority.
Our works were completed in a efficient and timely manner with regular interaction with the local residents to ensure minimal disruption throughout the ‘live’ development.
Duration of Works | 8 weeks |
New Kerbs | 460m |
Iron Works | 44 Nr |
Surfacing | 1,922m2 |
“The team have been polite, cheerful and above all, very hardworking. The team are industrious and a credit to themselves and their employers”